info for GROUP PROJECT.....

BILL OF QUANTITIES - work & material unit price





Item Description Unit Rate (RM)




1 Piling


Supply, deliver, unload M 18.00

handle, transport, pitch M 19.00

Cut Off to required level NO 12.00

Fillet weld to chamfered edge NO 15.00




2 WBL/ STRUCTURE


Excavation M3 3.00

Hardcore M2 9.00

Lean Concrete M2 6.00

G25 Concrete M3 250.00

BRC A5,A6,A7,…….. M2 15.00

Rinforcement, R6….Y10… TON 3,500.00

Formwork M2 28.00

Damp Proof membrane M2 10.00

Anti Termite M2 3.50




3 Workers


Carpenter DAY 65.00

Concreter DAY 60.00

Plumber DAY 65.00

Labour DAY 40.00

Electrician DAY 65.00




4 Materials


Cement bag 10.00

Sand M3 35.00

Brick pc 0.23

Plywood M2 16.00

Aggregate TON 30.00

Timber TON 4,000.00

TAKING OFF - reinforcement

No. Diameter of Bars




of Bar 6mm 10mm 12mm 16mm 20mm 25mm 32mm
Total Length (m) - - - - - - -
Unit Weight (kg/m) 0.222 0.616 0.888 1.578 2.466 3.853 6.313
Total Weight (kg) - - - - - - -
Total Weight (tonne) - - - - - - -