Monday, February 8, 2010

GROUP PROJECT........................

PREPARATION OF BILL OF QUANTITIES AND TAKING OFF FOR SINGLE/DOUBLE STOREY HOUSE

Learning outcome:
By the end of this session, the students are able to:
• calculate and prepare taking off (quantities measurement) for double storey house (CO3PO3)
• calculate and prepare cost estimation for double storey house (CO4PO3)
• calculate and prepare bill of quantities for double storey house (CO3PO3)

Guideline:
Students are encourage to:
• Search the internet for additional reading material.
• Use Microsoft excel for Taking Off works
• Get extra information from:
i) Jabatan Kerja Raya, JKR
ii) Majlis Perbandaran
iii) Related contractor @ consultant @ QS @ architecture company

Deadline:
Students should submit the assignment latest
1 April 2010 before 5.00pm

Content of project REPORT
1. Introduction (CO3PO7) 4marks
2. Grand Summary (CO3PO3) 2marks
i) Summary of Bill Of Quantities
3. Bill Of Quantities (refer appendix A3) (CO3PO3) 4marks
i) BOQ for double storey house
4. Abstracting (refer appendixA2) (CO3PO3) 4marks
i) Summary taking off
5. Taking off (refer appendix A1) (CO3PO3) 10marks
i) concrete
ii) reinforcement
iii) formwork
6. Estimation (CO4PO3) 10marks
i) concrete
ii) reinforcement
iii) formwork
7. Appendix (CO3PO4) 5marks
i) construction drawing
ii) surat permohonan mendapatkan “construction drawing and bill of quantities”
8. Conclusion (CO3PO7) 6marks